Wilo

0.000
Contact Information
Noginsk, Moscow 142400, Russia
Detailed Information

The construction of the plant in Noginsk-Technopark in the Moscow region began in 2013 with the purchase of a land plot. In autumn 2014, the foundation stone of the plant was laid. The volume of investments in the new production of WILO RUS amounted to 35 million euros. It is planned to create about 400 jobs at the plant. The project and the building of the plant were awarded the highest rating of the professional energy efficiency system GREEN ZOOM – “Platinum Certificate”. In May 2017, the production and warehouse complex “VILO RUS” was awarded the “Golden Certificate of the international certification system LEED-NC (New Construction)”. The object scored the maximum number of points in the sections: “Water Efficiency”, “Innovations”, “Regional Features”. According to the results of certification, the object scored 64 points. According to the results of energy modeling, the energy efficiency of the facility was 25.09%. The plant is located at 50 km of the Gorkovskoye highway (M7 highway Moscow – Nizhny Novgorod). On the territory of 5.5 hectares there is a production (8500 sq.m), a logistics center (7000 sq.m) and an administrative and office building (6110 sq.m). The plant has 21 assembly lines, 10 test pipelines for submersible pumps and one of the largest test benches in Europe with a pool depth of 12 m and a capacity of about 1000 cubic meters.